Canny Recall Dog Training Lead | Heavy Duty Extra Long Lead for Training Dogs & Puppies in Park or Yard | Train Your Dog to Come When Called | 23ft & 15ft, Black

★★★★★ 4.9 118 reviews

US$11.98
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by boshouseofobjects.be
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$11.98
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by boshouseofobjects.be
Free 30-day returns Details

Product details

Management number 226084328 Release Date 2026/05/09 List Price US$11.98 Model Number 226084328
Category

Canny Co Recall Trainer Leash - 15 Feet or 23 Feet (Black)Dog EssentialsFew things are more frustrating than a dog that won't come when called. Whether your dog is hesitant to return or simply chooses to ignore you, this behavior can strain your relationship. The Canny Recall Leash offers a solution by allowing you to gradually increase the distance between you and your dog during training. This approach helps you teach recall safely and effectively, ultimately granting both you and your dog the freedom you desire.Must HavesA must-have for every pet owner, our dog leash is designed with a strong, padded handle for your comfort. It features two grips spaced along the webbing, allowing you to easily adjust the length as needed. Equipped with a high-quality clip that stays securely fastened, even when your dog pulls, this leash ensures both durability and safety during your training sessions.Training Leash for DogsThe 15 foot dog lead is suitable for puppies and small breed dogs such as Jack Russell, Westie, Border Terrier, Pomeranian and Yorkie. The 23 foot dog leash is suitable for medium to large breeds such as a Border Collie, Labrador, Rottweiler, German Shepherd, Doberman Pinscher, Golden Retriever and Great Dane.FeaturesTeach Recall SafelyEasy On HandsSecure ClaspFully WashableFast Drying

  • Large Dog Leash - Improve your training sessions with our recall leash, specifically designed for teaching your dog to respond promptly when called. The ideal tool for instilling obedience and building a stronger bond between you and your pet.
  • Long Leash for Dogs - Constructed with a strong padded handle and two grips spaced along the leash to easily vary the length with a durable clip that stays tightly secured to a dog collar or harness. This leash is fully washable and easy to clean.
  • Dog Leashes - Keep your dog safe and secure. Whether you're training for recall or need a reliable dog tie out option, our leash ensures your dog stays by your side, stopping any escape attempts. Perfect for activities like camping, walking or running.
  • Puppy Training - Our long dog leash comes in a variety of sizes to accommodate small, medium and large dogs or puppies. Made with sturdy black nylon webbing for long lasting use. Our leash offers ample freedom, whether you're at the park or in your backyard.
  • Quality Construction - Featuring heavy duty materials including a padded handle and secure clip that can stand up to the playfulness and energy of dogs. If you are looking for a quality training leash or an extra long dog leash, this is a great choice.
ASIN B0DMCXBTNP
Size Length 23ft, width 1"
Color Black
Pattern Solid
Brand Name Canny
Unit Count 1.00 Count
Item Weight 0.81 Pounds
Manufacturer The Canny Company
Dog Breed Size Large, Medium, Small

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.9 out of 5
★★★★★
118 ratings | 48 reviews
How item rating is calculated
View all reviews
5 stars
89% (105)
4 stars
1% (1)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (12)
Sort by

There are currently no written reviews for this product.